top of page

USE IT FOR QUICK PIPE GRADE CHECKS

  • Choose the calculation you need.
  • Enter the known invert elevations, distance, slope, or fall required by that calculation.
  • Use Find Ending Invert to calculate where the pipe should finish.
  • Use Find Slope or Find Fall to check the grade between two elevations.
  • Use Check Intermediate Invert to verify grade at a point along the run.
  • Review the result before carrying the number farther down the trench.

Note: This tool supports field calculations and checks. Always verify plans, survey control, structure elevations, flow direction, tie-in conditions, and project requirements before relying on a calculated invert.

bottom of page