top of page
USE IT FOR QUICK PIPE GRADE CHECKS
- Choose the calculation you need.
- Enter the known invert elevations, distance, slope, or fall required by that calculation.
- Use Find Ending Invert to calculate where the pipe should finish.
- Use Find Slope or Find Fall to check the grade between two elevations.
- Use Check Intermediate Invert to verify grade at a point along the run.
- Review the result before carrying the number farther down the trench.
Note: This tool supports field calculations and checks. Always verify plans, survey control, structure elevations, flow direction, tie-in conditions, and project requirements before relying on a calculated invert.
bottom of page