Where Did the Day Go? How Small Delays Turn Into Lost Production
The concrete is finally finished. The forms were right. The grade was checked. The crew got the pour down. But there was a problem. You ran short on concrete. A balance load had to be ordered, and the crew spent part of the day waiting for the truck. By the end of the day, everybody was busy. Everybody worked. But you didn’t accomplish what you planned. So where did the day go? That’s one of the most important questions a field leader can learn to answer. Because being busy a
Dustin Bush
Oct 25 min read


How Much Concrete Do You Really Need? Measure the Pour Before You Order
You have a crew standing by. The forms are set. The trucks are rolling. Concrete is going in the ground. Then somebody realizes you’re going to be short. You call the plant for a balance load. Now the crew waits. The finishers wait. Equipment sits. The pour gets stretched out. And if the balance calculation is wrong too, you can find yourself waiting again because you’re still short. Being a yard short doesn’t sound like a major problem when you’re looking only at material qu
Dustin Bush
Sep 304 min read


How to Calculate Pipe Slope & Invert Elevations
How to Calculate Pipe Slope & Invert Elevations for Civil Construction This article is Part 1 of the OLH Pipe Grade Series. Pipe grade is more than a calculation. A crew has to understand the slope, build the pipe to the correct elevation, and document what happened during installation. This series follows that progression: Part 1 — Calculate the slope and invert elevations. Part 2 — Set pipe grade in the field. Part 3 — Document the pipe crew’s daily report. Start with the m
Dustin Bush
Sep 258 min read


How to Write a Construction Daily Report That Actually Protects the Job
How to Write a Construction Daily Report That Actually Protects the Job A daily report should be more than a record that says what the crew did that day. A good daily report tells the story of the work. It records who was there, what equipment was used, what was accomplished, what affected production, what directions were received, and what conditions may matter later. For a Foreman, the goal is not to write a novel at the end of every shift. The goal is to capture the right
Dustin Bush
Sep 226 min read